|
Ø Contracted to Johnson Service Group to stabilise the existing Citrix Presentation Server 3 farm which was prone to server crashes and printing problems. Resolved the issues causing the instabilities and standardised the build of the servers to ensure ongoing satisfactory performance of the farm.
|
|
Ø Installed, implemented and
support the final and current infrastructure for Citrix
Presentation Server 4, Windows Server 2003 Active Directory,
Exchange 2003 and a suite of 40+ applications. |
|
Ø Implemented a highly
redundant back end data storage infrastructure comprising of
2 HP Storage Area Networks replicating across two separate
locations. |
|
Ø Implemented the new Central |
|
Ø Joined two separate IT
infrastructures as De Vere Group PLC became part of the
Alternative Hotel Group. Involving a joining of two Wide
Area Networks, two Windows 2003 Active Directories and
presenting a single GAL for two separate Exchange 2003
organisations. |
|
Ø Upgraded the centralised
Sales Automation and Group Management system with real time
links to all properties. This also involved the combining of
two separate environments as Verve Venues hotels were merged
with De Vere hotels. |
|
Ø Successfully implemented
three wide area network upgrades over a period of 5 years
each time reducing costs and improving throughput and
reliability. Ultimately evolving into a final solution of
MPLS primary links with ADSL backup. |
|
Ø Successfully implemented two
office moves, the last one involving migrating WAN head end
connections, maintaining 2 Office LANs with an interconnect
between them and moving 200 user PC’s, plus a server
environment
comprising of 30+ servers. |
|
Ø Initial installation of an
NT4 and Exchange 5.5 infrastructure environment to support
27 sites around the |